The site sits on the corner of two streets. The ground floor follows their line and forms a white base for two commercial units; one is a ONCE office, designed in detail. Above, the homes step back from the street line and leave the corner open, as the neighbourhood had always known it, with a building that did not fill the site.
There are 14 homes: four per floor on the first three floors and two on the top floor, above a basement garage covering the whole plot. An inner courtyard brings light to the rooms at the back, and the terraces run along both façades with slate-clad planters that draw dark bands across the white.
The basement and ground floor cover almost the whole site. From the first floor up, the floors step back towards the party walls and leave terraces onto both streets; the top floor steps back further still, under a pergola. The stair and lift core rises through the centre of them all.
{{dText}}
Above the white base, the terraces step back from the corner and project in bands that change from one floor to the next. At the top, the penthouse level is finished with a pergola.






The planters run along each terrace and are clad in greenish slate. Below, the white base of the commercial units is closed with aluminium louvre screens.




Inside, a courtyard brings light to the rooms at the back. On the ground floor, the ONCE office rooms look out onto the street through the louvres.



Construction began at the end of 2005 with the raft foundation and the basement walls, below the water table, and finished at the beginning of 2007.



The slate bands still mark the corner, with the Judas tree in front of the base.


At dusk the lights under each overhang come on, and so does the shop behind the louvres.